1. Home /
  2. Home improvement /
  3. Shenandoah Valley Construction

Category



General Information

Locality: Thomaston, Georgia

Phone: +1 770-550-5779



Address: 2142 Hannah's Mill Rd 30286-1120 Thomaston, GA, US

Website: www.shenandoahvalleyconstruction.com

Likes: 515

Reviews

Add review

Facebook Blog



Shenandoah Valley Construction 16.11.2020

One of today's jobs. Thank you for your business!

Shenandoah Valley Construction 14.11.2020

Thank you for your sacrifice.

Shenandoah Valley Construction 07.11.2020

Goodmorning! Thank you all for hanging in there for information on storm shelters. We are expecting to receive our first LIMITED shipment within the next week. ***Estimates for installation on your property are FREE within a 30 mile radius of our workbase in Thomaston.***... These shelters will be available on a first come first serve basis and will require a 35% deposit down at time of booking. Price of shelter installed is $5800. ** Price of removing excavated material varies per job. **Storm shelters will be 5x7x6'1" concrete slope front and include: Double handrail (5 steps. (8 run / 8- rise, 22 wide) Steel door with hydraulic assist (33- x 29-) 6000 psi fibered concrete 8 wind turbine for ventilation 6 vent If interested in getting on our first shipment schedule, please contact Nathan or Crystal Mann via call,text or email @ 770.550.5779. 706.741.1892 or [email protected] ***Due to very limited stock, we will ONLY schedule when a deposit has been made.*** We look forward to serving your family!

Shenandoah Valley Construction 30.10.2020

Happy Sunday everyone! We pray everyone stays safe tonight and tomorrow with the weather predictions forecasted for middle Georgia. While we are still in the beginning stages of storm shelters, this is the information we currently have. Storm shelters will be slope front and include:... 1. Stairs with railings 2. Built in benches 3. Vents in the top 4. Fits approx 7-9 people Right now, we are potentially estimating $5500 installed, however this could fluctuate once we have more detailed information. Thank you all for your patience with us getting back to you. Please like and follow our business page for more updates. *** this picture is not affiliated with Shenandoah Valley Construction & Septic. It's purpose is to provide and example of shelters installed.

Shenandoah Valley Construction 17.10.2020

We will be closed today from pumping tanks and installing, diagnosing septic issues. Phones are down and texts aren't going through. We are helping our community from this horrible tornado early this morning. We apologize for any inconvenience. Thank you for understanding.

Shenandoah Valley Construction 01.10.2020

Save your pipes! Stop flushing lysol wipes, baby wipes, paper towels, disposable rags, etc. down your toilets. Only

Shenandoah Valley Construction 20.09.2020

As of right now, we are still serving the community as much as we can. In efforts to reduce COVID19 transmission, we are providing new ways to take your payment for septic work. Options are as follows: 1. Dropbox at our office @ 2142 Hannah's Mill Rd. Thomaston, Ga 30286 (The old York's meatplant). Please drop payment in envelope with your name, address and telephone #... 2. We can process credit card payments by phone 2. Send you a link via Email and you can enter in your information yourself. 3. Or you can still send a check by mail. If you have any questions, please feel free to call or text 770-550-5779 or 706-741-1892.

Shenandoah Valley Construction 17.09.2020

Yall know who to call!

Shenandoah Valley Construction 29.08.2020

Toilets flushing slow? Sewage backing up in your tubs, showers or toilets? The excessive amount of rain the past few months has oversaturated many drainfields- even good ones. The Thomaston Treatment Plant is temporarily closed due to all of the rain this week ... The treatment plant being closed means we are unable to dispose of your sewage . Our advice is to conserve, conserve, conserve your water usage until the weather clears so your drainfield can try to dry out. We understand the struggle of not being able to shower, flush toilets, and wash clothes. We hope to get to everyone on our schedule AS SOON AS POSSIBLE! The treatment plant will be open again next week. Keep praying for Thank you all for your support and understanding! Your Shenandoah Valley Family.

Shenandoah Valley Construction 12.08.2020

Whoever is doing the rain dance can stop now

Shenandoah Valley Construction 25.07.2020

Just a simple reminder ...Happy Tuesday Everyone!

Shenandoah Valley Construction 13.07.2020

Did you know septic tanks should have routine maintenance every 3-5 years? Pumping out your septic tank before there is a problem is key to saving money long term. Don’t wait until its too late, schedule your routine pump out and inspection for the New Year!